Shower Design & Installation Allen, TX

Call (469) 790-8909 to Get a Quote Now.

A Walk-In Shower Planned for Your Allen Home and Routine

Ready for a walk-in shower Allen homeowners actually look forward to using? VIP Services takes a shower project from bare framing to finished glass, handling demo, wall framing, floor slope, membranes, tile, valves, niches, seating and glass. With over 25 years in remodeling, we cover Allen from our Wylie office and price every element on its own line.

The Census Bureau estimated Allen’s population at 113,447 in July 2025, and plenty of those households are living with a cramped fiberglass stall or a shower squeezed beside a tub nobody uses. Whether you want to enlarge the stall, open it up with glass or convert the tub into a shower, we design around how you live.

Phase 1: Tear-Out Without Taking Over Your House

Containing the Mess

Before any tile comes off the wall, the house gets prepped so everyday life can continue:

  • Floor shields along our path into the bath
  • Zippered plastic barriers around the work area
  • Covers on the vanity, counters, mirror and toilet
  • A swept, safe room at the end of each workday

Once the old pan, tile and valve are gone, we inspect studs, plumbing and the slab or subfloor. Local clay soils move with wet and dry seasons, so crooked walls or past slab cracks get corrected now rather than after tile.

Phase 2: Waterproofing That Is Tested, Not Assumed

The layers you never see are the ones that keep water where it belongs:

  • Walls and curbs straightened, with blocking added for glass, seats and grab bars
  • A floor pitched evenly to a point drain or a trench drain
  • Backer board or foam panels sealed with a continuous membrane
  • A flood test of the pan before floor tile is set

Tile choices come next. Big wall panels mean less grout to clean, and small floor mosaics follow the slope and offer better footing. Over a slab with a history of movement, we add crack isolation under the tile.

Phase 3: Features That Make It Yours

Curbless Entry in an Allen Bathroom

Often possible. A zero-entry shower floor flows straight from the bathroom floor. On a slab, that may mean recessing the shower area or relocating the drain, and we evaluate the feasibility and cost before you commit.

Free of charge, our in-house designer lines up tile, metal finishes, glass and lighting and because each item is priced separately, you can decide where to splurge and where to save.

Smart Spots for Niches and Shelves

  • Recessed niches on a wall away from the direct spray
  • Shelf heights that suit your household
  • Shelves in stone, quartz or tile with a slight forward pitch
  • Clean metal edge trim or mitered corners

Choosing a Shower Seat

  • Built-in tile benches waterproofed with the walls
  • Cantilevered seats anchored to hidden wall framing
  • Hinged wall seats of teak or phenolic where space is tight
  • Stone or quartz bench tops that match the vanity
  • A handheld sprayer within reach of the seat

Valves, Showerheads and Controls

  • Pressure-balance or thermostatic valves to prevent temperature swings
  • Separate controls for a rain head, handheld or body sprays
  • Handheld rails strong enough to serve as grab bars
  • Brushed or matte finishes that hide water spots
  • Controls near the entry so you can turn on the water without getting wet

Designing a Shower for Every Stage of Life

Adding safety features now can save you from remodeling again later. Options include:

  • In-wall backing so grab bars can be added anytime
  • Entries with little or no step
  • Grippy floor tile and small mosaics
  • Openings wide enough for mobility aids
  • Adjustable-height handheld sprayers
  • Seating, fixed or hinged
  • Bright lighting and contrasting edge tile

Safety features can look elegant. Thoughtful tile and coordinated hardware make a safer shower look like a spa, which is helpful when older relatives visit or you plan to stay in Allen long term.

Glass Choices That Stay Clearer

According to the City of Allen, the city buys treated water from NTMWD, drawing on Lavon Lake as the main source along with Lake Texoma and Lake Cooper. Any tap water leaves mineral spots on glass as it dries, so the enclosure matters:

  • Heavy frameless panels with minimal metal tracks
  • A protective factory coating that helps water sheet off
  • Semi-frameless doors for a lower price point
  • Fixed panels for walk-in designs with no door
  • Door hardware in the same finish as your trim kit

More Allen Bathroom Remodeling Services

Bathroom with glass walk-in shower, mosaic tile wall and navy vanity

Complete Bathroom Remodels Allen

A gut-to-studs rebuild of the whole room: revised layout, new plumbing and wiring, a waterproofed shower, tile, cabinetry and lighting for Allen homes.

Before and after tub-to-shower conversion with glass walk-in tile shower

Tub-To-Shower Conversions Allen

Retire a bathtub nobody soaks in and gain a step-in shower with a sloped tile floor, storage niches and clear glass.

Before and after double vanity with white cabinets and wood-look floor

Custom & Pre-Finished Vanities Allen

Ready-made, semi-custom or built-to-order vanity cabinets with quartz or stone tops, drawers that fit your routine and new faucets.

Bathroom Remodeling Contractors

Bathroom Flooring & Tile Allen

Porcelain, stone and waterproof vinyl bathroom floors laid flat over a prepared, crack-resistant underlayment.

Before and after tub surround replaced with dark tile shower

Bathtub Installation Allen

Soaking, freestanding, alcove and drop-in bathtubs set on solid support, plumbed, sealed and finished with a matching surround.

Before and after tub-to-shower conversion with glass walk-in tile shower

Shower Design & Installation Allen

Tiled walk-in showers with seats, recessed shelves and glass, built over a leak-tested waterproof layer. Serving Allen from our Wylie office.

Bathroom Remodeling Contractors

Wallpaper & Popcorn Texture Removal Allen

Dated wallpaper and sprayed popcorn ceilings taken down, drywall repaired and refinished, then primed and ready for paint.

Before and after double vanity with white cabinets and wood-look floor

Bathroom Painting Allen

Steam-resistant coatings for bathroom walls, ceilings, trim and cabinets, applied by our own painters after thorough prep.

Bathroom Remodel Video Walkthroughs

Bathroom Remodeling Built for Comfort, Functionality, and Long-Term Value

Allen, TX Walk-In Shower Questions

Shower size, your tile and glass, any pipe relocation and extras like seating or a zero-step entry all move the number. Rather than quote a generic range, we give you an itemized proposal for your bathroom.

Often, yes. We move the drain and water lines, seal the enlarged footprint and complete it in tile and glass.

A factory-applied glass coating, a quick squeegee after showers and non-abrasive cleaners. Frameless panels also leave fewer channels for scale.

It varies with size, materials and features. Your scheduler maps out each step, from demolition to glass, in writing before demolition.

Yes. Options include a step-free entry, hidden grab-bar backing, seating, an adjustable handheld and textured tile.

Client "Pains" We Hear About Their Previous Remodeler
(and why they didn't call them back)

The VIP Services Difference

Zero Stress

Our dedicated project planner takes care of all the details before we begin your kitchen remodeling project. She reviews and confirms material orders, schedules design appointments, and ensures that every selection is followed up on.

 

With our kitchen remodeling services, you’ll benefit from the expertise of our complimentary in-house designer. They’ll meet you at your home to discuss your vision and preferences, and even join you when selecting materials and finishes from our suppliers. This personalized support ensures you make well-informed choices, so you can feel confident about your kitchen remodel.

 

Our dedicated full-time project scheduler will manage every aspect of your kitchen remodeling project. She ensures that all trades and workers are well-coordinated, keeping you informed throughout the process. Additionally, she will organize a kickoff call with the entire project team—our project scheduler, project planner, and project manager—before work begins. This call will address any questions or concerns, ensuring that everyone is on the same page and ready to proceed with a clear plan.

 

 

For over 25 years, we’ve provided Itemized Detailed Estimates rather than a single lump sum. Our transparent estimates come with Menu Pricing, allowing you to choose what you need and remove what you don’t, so you always know exactly what you’re paying for.

 
 

If you choose to add or modify anything during your kitchen remodeling project, we ensure that you receive a written change order for your approval before making any adjustments. This process guarantees that there are no unexpected costs or surprises at the end of your project. We prioritize transparency and client satisfaction—no hidden fees, no pressure.

 
 
 
 

1. 3-Year Workmanship Warranty: With over 25 years of experience and more than 150 positive reviews, we confidently stand by our work and are here to support you if any issues arise.

2. 1-Year Touch-Up Guarantee: We’ve got you covered for minor scratches and wear-and-tear with our 1-year touch-up guarantee. We’ll even send you a reminder as your project anniversary approaches, so you can easily address any tweaks.

3. Lien Waiver: To ensure you’re protected from paying twice for the same work, we provide a lien waiver. If a contractor doesn’t offer this, it’s easy to wonder what other important details might be missing.

 
 
 
 

Your VIP dedicated project manager will oversee your kitchen remodeling project with regular check-ins multiple times a week. They will liaise with trades, assess progress, and provide you with consistent updates to ensure everything stays on track. Expect weekly briefings on our progress, and the project manager will handle all necessary preparations for upcoming stages of your remodel.

 

Before kicking off your kitchen remodeling project, we conduct a thorough pre-construction walk-through with you and your Project Manager. This on-site meeting allows us to review the complete scope of work, address any questions or concerns, and discuss practical details such as parking and preparation needs.

 

You won’t have to worry about sending a big check and wondering if someone will show up in a few weeks. We believe in making the process as easy as possible. You won’t need to make a substantial upfront deposit just to secure your spot on our schedule. While custom items do require payment when ordered, we don’t ask for large sums in advance.

 
 

At VIP Services, we have a dedicated team of 10-12 in-house professionals specializing in painting, drywall, and carpentry. Unlike many in the industry, we go the extra mile by providing worker’s compensation insurance for our employees, even though it’s not mandated by Texas law. This protects you from any potential accidents or claims. We pride ourselves on keeping a tidy job site by adhering to our thorough daily clean-up procedures.

 
 
 

You won’t be asked to purchase overpriced materials or pay hidden markups when you work with us. We don’t use commissioned salespeople to inflate your costs or push unnecessary extras.

 
 

Trusted All Around The Web​

Google logo with five gold stars

I’ve had the chance to see the work VIP "Services delivers, and I’m genuinely impressed. Their professionalism, attention to detail, and consistency really stand out. It’s clear they take pride in what they do and focus on quality from start to finish. - Pranish

Google logo with five gold stars

"Blake at VIP services has been transparent in laying out the project including costs and options. They did a great job with the shower! Services" Bathtub refinishing, Tile work installation, Drywall installation - Stephen

Google logo with five gold stars

"This is an outstanding company. I had never used them before and I’m very picky, but they exceeded my expectations with excellent work at a reasonable price, and in a timely manner! I highly recommend them!" - John

HomeAdvisor logo
Thumbtack logo
Angi's List logo
Google Guaranteed badge with green check mark and five stars
Google Guaranteed Contractor badge with five stars
Better Business Bureau A+ rating logo
Facebook logo with five gold stars
Gold 3 years warranty seal

Plan Your New Allen Shower With VIP Services

If your current shower feels cramped or the tub just collects dust, let’s design something better. Every Allen project includes itemized pricing, free design help, a dedicated project team, a three-year workmanship warranty, twelve months of touch-up coverage and a signed lien release. Get your free quote, contact us, or explore financing options.

Experience the Gold Standard of Bathroom Remodeling

© Copyright 2026 VIP Services