Bathroom Framing and Drywall Wylie

Bathroom Framing and Drywall in Wylie, TX

While the tiles and fixtures get the attention, the structure behind your walls is what guarantees the longevity, integrity, and safety of your new bathroom. Our approach to framing and drywall ensures your remodel is built on a solid, professional foundation that is specifically engineered for the high-moisture environment of a bathroom.

 The Critical Foundation: Framing and Drywall in Your Bathroom Remodel

a corner shower with brown cabinets

Phase 1: Structural Reframing – Preparing the Walls

Reframing is necessary to accommodate layout changes, modernize structural support, and properly prepare for new fixtures.

1. Relocating and Modifying Walls

  • Layout Changes: If you are changing the size of the room, moving the shower, or shifting the toilet, structural reframing is required. This involves tearing down and rebuilding non-load-bearing walls or reinforcing areas to ensure the structural integrity of your home remains sound.

  • Doorway Adjustments: We reframe existing doorways to fit new, wider doors (ideal for accessibility) or to accommodate pocket doors, which save valuable floor space in small bathrooms.

  • Expanding or relocating a shower or tub: Reframing a closet or adjacent room to expand a closet or shower, or relocate the shower altogether for better flow and more usabilty

Building a linen or storage closet: Removing an existing tub to accommodate a new walk-in shower is a common request. The existing unused shower space is often converted to a linen closet, open shelving or a mirrored desk vanity.

2. Creating Recessed Niches and Shelving in Wylie

    • Shower Niches: This is a key feature in modern showers. We precisely cut and frame recessed niches into the wall cavity between existing studs. This provides built-in, clutter-free storage for shampoos and soaps. Proper framing here is crucial for ensuring the niche is plumb and water-tight.

    • Vanity Support: For floating vanities, we often install specialized blocking or reinforced framing (usually horizontal 2x4s or plywood) between the studs to securely anchor the heavy wall-mounted unit, countertop, and sink.

Fold-Up-Shower-Seat1-scaled-1.jpeg

Phase 2: Drywall finishing and Changes

Replacement – not coming in most bathrooms since most baths. Drywall can remain while patches or often included

Texture - retexturing walls and ceilings are common an older bathrooms. Dated textures can be filled and replaced with updated styles

Wallpaper – well not as popular as it once was, all papers still use sparingly and guest baths usually with upgraded fixtures and lighting. Sealing over and removing dated wallpaper is a much more common request in most bathrooms.

3 things to consider when reframing or modifying drywall

  1. Use the Correct Moisture-Specific Drywall Materials. A bathroom is a high-humidity environment. Wet Areas (Shower/Tub Surround) should be installed with Cement Board. These materials are not affected by water and provide the necessary rigid, stable base for tile, which standard drywall does not. More about Wylie tub-to-shower conversions.

  2. Install Blocking for Fixtures and Accessories -Reframing is the one time you have full, unobstructed access to the inside of your walls. Install horizontal wood blocking (usually 2x4s or 2x6s) between the vertical studs at the exact heights where you plan to install.

  3. The correct paint is critical. Often overlooked, using the right mold and mildew resistant paint will keep your bath looking better longer, and prevent timely cleaning and upkeep. Typical paint, even high-quality products, won’t specifically protect walls and ceilings that are exposed to high humidity on a daily basis.

Why Our Approach Matters

Framing and drywall are the core structure upon which all aesthetics—tile, paint, and trim—depend. By focusing on professional, code-compliant framing and utilizing moisture-specific materials, we ensure your remodel delivers:

  • Longevity: Walls that will not warp, soften, or foster mold growth due to humidity.

  • Stability: Secure anchoring for heavy fixtures like vanities, towel bars, and grab bars.

  • Flawless Finish: Perfectly plumb, square, and level surfaces that allow for impeccable tile installation and paint finishes.

Don't compromise the future of your bathroom with standard practices. We know that delivering a quality product is very important, but we also know that the process and experience you have while getting there is just as important.

Contact us today to discuss the foundational work that will make your bathroom remodel last for decades.

Beyond the Finish: The VIP Difference in Bathroom Remodeling

You deserve more than just a beautiful bathroom. You deserve a stress-free experience getting there.

Every remodeling company promises quality materials and skilled installation—and frankly, delivering a good finished product is the easier part of the job. But what happens during the months-long process? If you’ve heard horror stories from other homeowners, you know that a great result can often come with frustrating delays due to improper planning, poor communication, and a lack of respect for your home.

Our Core Focus: The Unmatched Client Experience

At VIP Services, we don't just build stunning bathrooms; we build trust through a superior process. Our primary focus is on your peace of mind from day one to final walk-through.

This is how we guarantee a better experience:

  • Detailed, Upfront Planning: We slow down before we start. We utilize a rigorous planning phase to ensure every single detail—from plumbing clearances to tile layout—is confirmed. This proactive approach eliminates costly surprises and frustrating delays once construction begins.

  • The Right Team & Process: We maintain a dedicated team of professionals who are also trained in our strict standards of communication, punctuality, and job site cleanliness. Your team includes a dedicated Project Planner (getting all the ducks in a row), a Project Scheduler (that schedules every trade to eliminate large gaps in your timeline), and a Project Manager (that will review everything before we start at your critital VIPS Pre-Construction Meeting)

Clear, Consistent Communication: We keep you informed at every milestone. You will always know what to expect next, who will be in your home, and when the project is on track for completion.

We know delivering a high-quality finished product is important, but we believe the process and experience you have while we get there is just as important.

Ready to Experience a Remodel That's Actually Enjoyable?

Stop worrying about the headaches and start looking forward to your dream space.

Visit our dedicated process page at VIPServices4u.com to see our unique approach, detailed processes, and project guarantees.

Don't just remodel your bathroom - Upgrade your remodeling experience.

Click Here to Schedule Your VIP Consultation Today

  • a vanity with white cabinets and tan counter top
  • a glass shower with white tile
  • a glass shower with a colorful tile wall
  • a bathroom with all white cabinets
  • a bathroom with brown wooden cabinets
  • a bathroom with blue green cabinets
  • a glass shower in a white bathroom
  • A bathtub in a bathroom
  • A renovated bathroom
  • Bathroom Remodeling Costs In Richardson Hero.jpg
  • Bathroom Remodeling Costs In Wylie Texas.jpg
  • A modern bathroom
  • A bathtub
  • a stone tile shower
  • a shower niche with shampoo in it

Recent Wylie Bathroom Projects

Transform your bathroom into a space that’s both beautiful and built to last. Our Wylie remodeling team brings years of craftsmanship and design experience to every project—combining high-quality materials, precise installation, and attention to detail that shows in every photo.

Whether you’re updating a small guest bath or creating a luxury spa-inspired retreat, we’ll help you bring your vision to life with custom finishes, modern fixtures, and a seamless remodeling process from start to finish.

More Wylie Bathroom Remodeling Services

bg 2.jpg

Complete Bathroom Remodels

"Down to the Studs" remodel with an upgrade. 3-year warranty and 1-year Free Touch Up.

Learn More

3-May-17-2022-16-40-14-h1e8.jpeg

Tub-To-Shower Conversions

Convert your old tub to a new stand-up shower. Ask about all of our conversion options now!

Learn More

a bathroom with blue green cabinets

Custom & Pre-Finished Vanities

Enhance your bathroom’s storage and design with custom-built or pre-finished vanities crafted to match any Wylie interior.

Learn More

AdobeStock_414833401.jpeg

Bathroom Flooring Options

Choose from durable, stylish flooring options, including tile, vinyl, and waterproof laminate. Professionally installed for lasting beauty in your bathroom.

Learn More

5.jpeg

Tub Installation Options

From Garden tubs to Free-Standing Tubs, check out the options to consider here.

Learn More

how-to-hang-drywall-step-4.jpg

Shower Options

Elegant, functional shower designs, from walk-ins to custom tile surround, installed with precision by our Wylie team.

Learn More

00_strip_wallpaper_xl-1.jpg-1.jpg.optimal.jpg

Wallpaper & Popcorn Texture Removal

Strip, sand, and retexture to update your entire bath.

Learn More

15-Sep-30-2019-19-44-46-qg4b.jpeg

Complete Bathroom Painting

We have 10+ in house painters focused on excellent preparation and attention to detail.

Learn More

how-to-hang-drywall-step-4.jpg

Reframing and Drywall

Ensure your bathroom remodel starts with a solid foundation through expert reframing, drywall installation, and wall repairs in Wylie, TX.

Learn More

The VIP Services Difference

At VIP Services, we take pride in delivering exceptional craftsmanship and honest, reliable service on every project. Our experienced team ensures every detail is handled with care—so your remodel not only looks great but lasts for years to come.

Low-Stress Process

Dedicated Project Planner focused on making sure that all of our ducks-are-in-a-row, and everything is ready (either on site, or ready for pickup) BEFORE we swing the first hammer.

She will review all material orders, schedule design appointments and follow up on all selections. Nothing starts until she gives her stamp of approval! This process avoids untimely delays, rework and surprise change-orders for your project.

She will follow our written check-list to be sure we understand: how to access your home, if you have pets, dumpster location preferred, alarm codes, etc…. This is all part of proper planning!

Designer Help

Don’t be terrified of making a mistake!. Our In-House Complimentary Professional Designer is here to help! All of our Bathroom Remodel Projects Include Help with our Interior Designer that will meet at your home, discuss your ideas and materials you like, as well as accompany to our Suppliers to assist you with making all of design choices to achieve the best results, to alleviate the worry that you might make the wrong decision!

Constant Proactive Communication

Our In-house Full-Time Project Scheduler will coordinate every trade or worker that works on your home. She will ensure that you are informed at each step of the process. She will also set up a kick-off call to review any questions or issues with everyone involved in your project (VIPS Project Scheduler, VIPS Project Planner, VIPS Project Manager) BEFORE the project starts so we can be sure to address any concerns prior.

Guaranteed Pricing & Detailed Estimates

The quote we provide will be a guaranteed price. After providing bathroom remodeling for 20+ years, VIPS Services has the experience to cover all the details while providing Itemized Detailed Estimates instead on one big list and one big take-it-or-leave-it Grand Total. Always transparent estimates with Menu Pricing – Select what you want, remove what you don’t and always know what you are paying for. Don’t accept an estimate that is lite on details, which puts you at an unfair advantage. With VIP Services’ detailed and clearly worded Proposals, You will never need to say “I thought that was included”

We’ll even set up a 1 hour virtual-call to review your estimate, go through all the details, and answer any questions so you clearly understand what is included. (Some items like plumbing may be listed as an approximate, pending demo. Anything not guaranteed will be specified and clearly marked on the estimate. )

Change Orders - Always Pre Approved & In Writing

If during the course of your project, you decide to add or change anything, we will always provide a written change order for approval prior for any changes so there are no surprises at the end of the project. This is the only way we do business! No obligations, no pressure.

3 Guarantees In One

1. 3-year workmanship warranty – less worry that in a year or so, you’ll discover issues that are not covered. We’ve been providing improvements for 20+ years with over 150 reviews and great ratings, so we will be here to back up our work!

2. Complimentary 1-year touch-up guarantee. – no worries about minor scratches and wear-and-tear. WE have you covered! We’ll even email a reminder near the end of your 1-Year project-anniversary!

3. Lien Waiver to protect the homeowner from paying twice for the same work. If your contractor is not offering this, you should wonder “What else are they missing?”

Assigned Project Managers

Your VIPS Dedicated Project Manager that will check in on the your Project 2-3 times each week, or more often as needed to meet trades, review progress, and update your regularly to be sure everything is coordinated. He will also update you so that you know our plans each week, and coordinate any prep. that is needed for next steps.

On Site Walk Thru Before Starting

Pre-Construction Walk-through with you and your Project Manager to review the entire scope of work and address any concerns, discuss parking, prep needed, etc. This is an on-site review before the crews arrive, to ensure everyone is on the same page.

Don't Pay To Get On Your Contractors Schedule

No large upfront deposits to “Get on Our Schedule” weeks or months before the project starts – Don’t worry that you sent a big check earlier and wonder if someone will show up in a few weeks! While custom items do required payment at the time of ordering, we don’t force clients to provide thousands of dollars in deposits just to guarantee their spot!

In House Employees

VIPS employs 10-12 workers as IN-HOUSE employees for most of the work we provide which includes painting, drywall and carpentry. VIPS employees are also covered under our worker-comp. insurance (NOT required by the state of Texas) so that you are protected from any accidents or claims. These employees are also trained in our VIPS Written Painting & Daily Clean-Up Procedures to ensure that the work progresses in a timely manner while keeping your home as organized, clean, and worry-free as possible. A messy job site is one of our pet peeves.

No Commissions/No Required Material Purchases

VIPS Services has never had a requirement to buy marked-up materials (tubs, faucets, lights, etc….) to work with us. Don’t be forced to pay an added markup just to work with your contractor! VIPS Services does not send a Commissioned Salesperson to drive up your cost or offer “extras” you don’t need. Our commitment is to provide professional advice and options, while avoiding pitfalls that may cost you more in the short term or long-run. Whatever you do, you can trust that VIP Services will provide sound, professional advice that suits your interest.

Client "Pains" We Hear About Their Previous Remodeler (And why they didn’t call them back!)

  • They were messy (no daily clean up procedure)

  • I never knew who was showing up (no Dedicated Project Scheduler)

  • I didn’t know what I needed to buy (no Dedicated Project Planner)

  • I didn’t know what was happening everyday at my home (no Dedicated Project Manager)

  • The crews didn’t know what to do (no written work orders)

  • I didn’t know what it would really cost (no itemized Proposals)

  • I didn’t get any help with choosing materials (no In-House Interior Designer)

  • I didn’t trust them in my house (no background checks)

  • I could never get in-touch with anyone about my issues (no Dedicated Project Manager)

  • The project kept getting delayed (no dedicated Project Scheduler)

  • They didn’t have the materials they needed (no dedicated Project Planner)

  • The project manager wasn’t up to speed on the project (no pre-construction walk-thru)

  • Everyone wasn’t on the same page (no Kick-Off meeting before starting construction)

Get Your Bathroom Remodeling Quote Today

If you’re getting ready to invest in any bathroom remodeling, don’t hesitate to reach out to us. We’ll be happy to give you as much time as you need, and answer all your questions.

See what it means to be treated to the VIP Services Standard. We look forward to hearing from you soon!

Get a Bathroom Remodeling Quote